|

Elevated deck pour at Baxter Hyland Parking
Facility |
|
BAXTER HYLAND PARKING FACILITY
Los Angeles, California | Five story post-tensioned concrete, 600 car parking facility. Ductile concrete moment frame design. This facility was built on spoils from the Los Angeles River, and required an extensive foundation/slab on grade design. |
| |
|
| |
LOS ANGELES COUNTY DPSS PARKING FACILITY | El Monte, California | Eight story post-tensioned concrete, 840 car parking facility. Ductile concrete moment frame design. Operated by the County of Los Angeles. |
|
| FIRST STREET PARKING FACILITY | Alhambra, California | Five story post-tensioned concrete, 250 car parking facility. Ductile concrete moment frame design. Operated by the City of Alhambra. |
|
 
Renderings of the
Garfield Entertainment Center Parking Structure |
|
EXPERIAN PARKING FACILITY
Costa Mesa, California | Five story post-tensioned concrete, 1,370 car parking facility. Ductile concrete moment frame and shear wall. |
| |
|
| |
GARFIELD ENTERTAINMENT CENTER
Alhambra, California | Five story post-tensioned concrete, 800 car parking facility. Ductile concrete moment frame and shear wall. |
| |
GRAND AVENUE CORPORATE CENTER
El Segundo, California | Two story, poured in place post-tensioned concrete parking facility. Shear wall lateral system. |
| |
|
| |
AGUA CALIENTE CASINO PARKING STRUCTURE | Palm Desert, California | Three story, 1,400 car parking structure. Poured in place post-tensioned concrete parking facility. This large facility encompassed several concrete pours in excess of 30,000 square feet to maintain aggressive construction schedule. |
| |
|
| |
PRI PARKING FACILITY | La Jolla, California
Four story, 530 car combined shear wall and moment frame parking facility. |
|
| PECHANGA PARKING STRUCTURE | Temecula, California | Three story, 1,300 car, combined shear wall and moment frame parking structure. |
|
| RIVERSIDE COUNTY ADMININSTRATIVE CENTER | Riverside, California | Three story, 750 car, shear wall parking structure and pedestrian bridge. |